Coastal Strata Group
Coastal Tower, Level 12
5 Esplanade, Surfers Paradise QLD 4217
- Client
- Coastal Strata Group
- Location
- Brisbane
- Assets
- 3
- Service
- 1 due soon
Open work at this Site
0 open jobs, plus 1 quote out worth $4,230, ex GST
Map and access
Access notes
Students on site in term time. Working-with-children check required. Keep vehicles out of the quad before 9am.
Contacts
Gary Hosking
Strata manager, Coastal Strata Group
Assets
| Tag | Asset | Make and model | Serial | Position | Installed | Next service | Jobs |
|---|---|---|---|---|---|---|---|
| AHU-01 | AHUHVAC | Temperzone AHU-1200 | TEAH-009487 | Level 2 plant | 2012 | 25/10/2026Due soon | None |
| CH-01 | ChillerHVAC | Trane RTAF 300 | TRCH-021160 | Rooftop plant | 2015 | 30/11/2026 | None |
| EF-01 | Exhaust fanHVAC | Fantech AP0804AP | FAEF-032833 | Car park | 2018 | 15/02/2027 | None |
3 Assets. Due soon means within 14 days.
Jobs at this Site
| Job | Title | Status | Value |
|---|---|---|---|
| 10455 | Supply air diffuser and VAV box replacement | Invoiced | $7,480 |
1 job. Values are ex GST.
Quotes at this Site
| JN | Quote | Status | Due | Value |
|---|---|---|---|---|
| 10413 | Boiler flue inspection and repair | Sent | 22/10/2026 | $4,230 |
1 quote. Values are ex GST.